Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 37 results ...

Abbas, N M A (2007) Construction claims in Saudi Arabia: a study of sources and associations of claims, Unpublished PhD Thesis, Department of Civil Engineering, University of Strathclyde.

Abdalall, S (2017) Concurrent delay analysis in public works construction disputes: a cross-jurisdictional study of Egypt, Scotland and England, Unpublished PhD Thesis, Law School, University of Strathclyde.

Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects, Unpublished PhD Thesis, , University of Strathclyde.

Al-Meshekeh, H S S (1991) The relationship between conflict management style and construction project effectiveness, Unpublished PhD Thesis, , University of Strathclyde.

Alahmadi, N H (2018) Nudging contracting firms rivals within municipal road projects in Saudi Arabia to bid competitively, Unpublished PhD Thesis, Department of Architecture , University of Strathclyde.

Bell, T (2018) A detailed investigation into the engineering properties and challenges affecting the potential introduction of a UK grown dowel-laminated timber floor panel into the domestic construction market, Unpublished PhD Thesis, Department of Architecture, University of Strathclyde.

Branki, C N E (1995) Agents, applications, and interactions in collaborative building design, Unpublished PhD Thesis, , University of Strathclyde.

Campos, C R (2023) Simplified Matlab calculation tool for LCA optimization of domestic buildings, Unpublished PhD Thesis, , University of Strathclyde.

Charley, J (1995) The dialectic of the built environment: A study in the historical transformation of labour and space, Unpublished PhD Thesis, , University of Strathclyde.

Coffey, M (1995) The propensity for participation in mechanical and electrical sub-contractors in the British construction industry, Unpublished PhD Thesis, , University of Strathclyde.

Collins, H J (2007) Identity and interpretation of the built environment: a case study of interpretation of symbolic artefacts in the organisational built environment and it's effect on the identity forming process, Unpublished PhD Thesis, , University of Strathclyde.

Craigen, A (1990) Britain's school building estate: evaluation by life cycle for effective maintenance, with an illustrated study on Glasgow schools, Unpublished PhD Thesis, , University of Strathclyde.

Cummings, A J G (1980) The York Buildings Company: A case study in eighteenth century corporation mismanagement, Unpublished PhD Thesis, , University of Strathclyde.

Duncheva, T A (2019) Offsite timber systems multi-factor productivity index, Unpublished PhD Thesis, Department of Architecture , University of Strathclyde.

Hajjah Dayang Suzana, B H A A (2006) An exploration of the business environment of the construction industry of Negara Brunei Darussalam: in the context of public-private partnerships, privatisation and private finance initiatives, Unpublished PhD Thesis, Department of Architecture and Building Science , University of Strathclyde.

Hand, J W (1998) Removing barriers to the use of simulation in the building design professions, Unpublished PhD Thesis, , University of Strathclyde.

Hassanien, A (2003) Analysing hotel repositioning through property renovation in the hospitality industry, Unpublished PhD Thesis, The Scottish Hotel School , University of Strathclyde.

Hughes, J (2020) Global claims in engineering and construction contracts, Unpublished PhD Thesis, Law School , University of Strathclyde.

Ibrahim, W A B (2016) Regulatory framework for adjudicators in the Malaysian construction industry, Unpublished PhD Thesis, Law School , University of Strathclyde.

Makulsawatudom, A (2003) Construction productivity measurement and improvement in Thailand by improved work-sampling, Unpublished PhD Thesis, Department of Architecture and Building Science, University of Strathclyde.

Mansfield, N R (1990) The internationalisation of the British construction consulting sector and technology transfer in developing countries, Unpublished PhD Thesis, Department of Marketing , University of Strathclyde.

McElroy, L B (2009) Embedding integrated building performance assessment in design practice, Unpublished PhD Thesis, Department of Architecture and Building Science , University of Strathclyde.

McLellan, R (1994) The use of project management procedures by construction contractors, Unpublished PhD Thesis, Department of Civil Engineering , University of Strathclyde.

  • Type: Thesis
  • Keywords: bidding; interview; maintenance; project management; quality management; repair; tendering; UK
  • ISBN/ISSN:
  • URL: http://oleg.lib.strath.ac.uk:80/R/?func=dbin-jump-full&object_id=21349
  • Abstract:
    Research into the use of project management procedures has mostly been directed at the private sector of the construction industry, despite the fact that the public sector contribute almost half of the UK's construction output, in the repair and maintenance sector of the construction industry. Indeed, since the introduction of compulsory competitive tendering (CCT) in 1980, the public sector has had to carry out a continually increasing proportion of their work under competitive conditions, bidding for work along with private sector construction contractors. This thesis focuses on the use of project management procedures in both private and public sector construction contractor organisations, looking at the utilisation of a number of different project management procedures, including organisation profile, project planning and control, quality management, and human resource considerations. It is believed that all these aspects must be considered together, if an accurate picture of an organisation's approach to the management of projects is to be achieved. The argument employed throughout this study is that where project management procedures are adopted in the management of projects, a project manager will have the potential to better manage the project, than would otherwise be the case. Empirical research was carried out using both a quantitative approach (structured mail questionnaire) and a qualitative approach (semi structured interviews). 100 responses were received in all, 80 to a questionnaire for construction contractors, 63 in the private and 17 in the public sector. Personal interviews were carried out with 20 project managers. Analysis of the data investigated the use of a number of different project management procedures and identified differences in their use between private and public sector contractors. The results showed that despite tendering for and carrying out work in the same market area, there were notable differences in the use of project management procedures between private and public sector construction contractors. In the main, private sector construction contractors utilised project management procedures to a greater extent than contractors in the public sector; however, in many instances the use of such procedures could hardly be described as extensive. For example, planning in many instances did not extend to the monitoring and control phase once projects were underway; the 'baseline' plan was effectively disregarded for updating project status, particularly so in the public sector. Despite the powerful nature of performance monitoring techniques, such as 'earned value analysis', little use was made of them. This general lack of project control was further exacerbated because both private and public sector construction contractors tended to operate separate 'stand alone' project costing systems, remote from those used for project planning and control purposes. There was a strong commitment to quality in both the private and public sectors. However, a noticeable difference wast that the private sector tended to apply their quality management systems to all areas of their business, whereas, the public sector normally only operated such systems for restricted areas of work, when compared to the 'overall' project. Of further concern was that both private and public sector construction contractors took account of the 'human' element to a much lesser degree than issues of time, cost or quality, even though they said they viewed it as important. Notwithstanding the existence of project management procedures for many years, there was a common lack of awareness and under utilisation of all but the most straightforward procedures in both sectors of the industry. This was especially so within the public sector. Essentially, private and public sector construction contractors must initiate familiarisation and training programmes within their organisations to enable their project managers to access the best project management 'tools' available to assist them in their projects.

Mohd Nor, M F I (2019) The development of a pedagogical framework for the integration of building information modelling in the architecture degree programme in Malaysia, Unpublished PhD Thesis, Department of Architecture , University of Strathclyde.

Morbitzer, C A (2003) Towards the integration of simulation into the building design process, Unpublished PhD Thesis, , University of Strathclyde.

Nakhi, A E (1995) Adaptive construction modelling within whole building dynamic simulation, Unpublished PhD Thesis, , University of Strathclyde.

Newton, S (1983) Analysis of construction economics: a cost simulation model, Unpublished PhD Thesis, Department of Architecture and Building Science , University of Strathclyde.

Orsaah, S (1984) Perception and management of risk in the construction industry, Unpublished PhD Thesis, Department of Marketing , University of Strathclyde.

Salamati, A A (2001) Urban housing design in Iran in response to socio-cultural and environmental conditions, Unpublished PhD Thesis, Department of Architecture and Building Science, University of Strathclyde.

Sinha, S (2006) Skill based framework for measuring complexity of construction projects, Unpublished PhD Thesis, , University of Strathclyde.

Tennant, S (2007) Site management teams and project performance in the UK construction industry, Unpublished PhD Thesis, Department of Architecture , University of Strathclyde.

Verzobio, A (2020) Supporting rational decision-making in civil engineering, Unpublished PhD Thesis, , University of Strathclyde.

Walters, R J (1983) An evaluation of user experience of CAAD: With particular reference to health buildings, Unpublished PhD Thesis, , University of Strathclyde.

Wools, R M (1971) The subjective appraisal of buildings, Unpublished PhD Thesis, , University of Strathclyde.

Yakubu, S U-N (2017) The barriers to the implementation and enforcement of the Building Code Standards Structural Provisions for mid-rise residential buildings: the case of Nigeria, Unpublished PhD Thesis, , University of Strathclyde.

Zhang, L (2022) Risk management framework to guide off-site manufacturing process: a Chinese perspective, Unpublished PhD Thesis, , University of Strathclyde.

Zubairu, M (1990) Sites and services housing development: Strategies for improving the effective demand for projects by low-income families in the urban areas of Nigeria, Unpublished PhD Thesis, , University of Strathclyde.